Cook County Health Mechanical Job Order Contracts (JOC)
JOBSITE BEFORE & AFTER PHOTOS
PROJECT: Robbins Health Center
CLIENT: Cook County Health – Job Order Contract
PRIME CONTRACTOR: Autumn Construction Services
CONTRACT VALUE: $454,992.15
LOCATION: 13450 Kedzie Ave, Robbins, IL 60472
SCHEDULE: March 2026 to August 2026
Autumn Construction Services will serve as the Prime Contractor for this Cook County Health Job Order Contract, providing a comprehensive mechanical and controls upgrade to enhance system efficiency, reliability, and overall building performance.
The project will include the replacement of an existing gas-fired boiler with two high-efficiency boilers piped in tandem, complete with BACnet-enabled controls, BMS integration, modified roof exhaust and intake systems, and condensate neutralization. Hot water pumps will be replaced with energy-efficient VFD-driven units, providing enhanced system control and monitoring.
The mechanical room hydronic piping will be reconfigured with new piping and supporting systems to improve space utilization and long-term performance.
Inspiring Technologies Corp will provide BAS temperature controls, upgrading 25 VAV zones with new DDC controllers, sensors, actuators, and BACnet communications. A Tridium Niagara N4 JACE-8000 Supervisor shall be connected to the local IP network to provide centralized monitoring, trending, and alarming.
This project highlights Autumn Construction Services’ leadership as Prime Mechanical Contractor and its successful collaboration with Inspiring Technologies Corp to deliver a fully integrated, high-performance HVAC and BAS solution meeting the rigorous standards of a healthcare environment.
PROJECT: Cottage Grove Medical Center
CLIENT: Cook County Health – Job Order Contract
PRIME CONTRACTOR: Autumn Construction Services
CONTRACT VALUE: $271,280
LOCATION: 1645 Cottage Grove Ave, Ford Heights, IL 60411
SCHEDULE: March 2026 to August 2026
As part of the Cook County Job Order Contract, Autumn Construction Services is awarded the mechanical upgrade of an aging boiler system to improve energy efficiency, reliability, and system performance. The project replaces an existing gas-fired boiler with two high-efficiency Weil-McLain condensing gas-fired boilers, installed in a tandem configuration to provide redundancy and optimized load management.
The scope includes the reuse of the existing roof vent stack, upgraded hydronic piping, and pumps. The new boilers will be fully integrated with the building management system for advanced monitoring and control. Piping is being strategically rerouted to improve the mechanical room layout and free up usable floor space.
Autumn Construction Services will serve as the prime contractor with Inspiring Technologies Corporation providing specialized temperature controls support. This project showcases our team’s ability to deliver high-performance mechanical solutions efficiently and seamlessly within Cook County’s Job Order Contracting program.