Photos featuring chiller hoist and air handling unit AHU installation
OWNER: Cicero School District 99
OWNER REPRESENTATIVE: Vision Construction & Consulting, Inc.
PROJECT: Brian Dominick Early Childhood Center
LOCATION: Cicero, IL
PROJECT VALUE: $2,775,300
CONSTRUCTION START: May 2026
COMPLETION: July 2027
Autumn Construction was awarded the mechanical scope for the Brian Dominick Early Childhood Center. Vision Construction & Consulting, Inc. is serving as the construction manager. The new facility is a 35,000-square-foot, single-story classroom building with a 5,600-square-foot landscaped interior courtyard and walking path.
The mechanical scope includes installing new hydronic heating, chilled water, and gas piping systems throughout the facility. These systems serve the central chiller and boiler plant, air handling units, energy recovery ventilators, fan coil units, pumps, hydronic specialties, cabinet unit heaters, and unit heaters.
Autumn will self-perform all mechanical piping and subcontract ductwork, insulation, temperature controls, and testing and balancing. The temperature controls will be integrated into the building automation system (BAS) and coordinated with the control valves, pumps, and variable frequency drives associated with the hydronic systems.
Autumn will coordinate and manage the qualified subcontractors responsible for testing, adjusting, and balancing, as well as commissioning. Commissioning activities include startup, functional testing, seasonal testing, and owner training.
Autumn Construction looks forward to working with Cicero School District 99 and Vision Construction & Consulting, Inc. to deliver a successful project.