The University of Illinois Chicago (UIC) College of Engineering is opening a fully functional robotics lab at the campus Makerspace facility. The project team is tasked with providing an all new, air handling unit to provide temperature control and humidity control for the lab. Autumn was selected to complete the installation of a steam heat exchanger, pumps, piping, and insulation. The project team included Autumn, Althoff Industries, Automatic Building Controls and McWilliams Electric.
Autumn Installs Temperature Control Equipment at UIC Engineering Makerspace
Previous
Previous
Autumn Begins Work on Rush University Medical Center In-Floor Radiant Heating
Next
Next

